Stormwater drainage work in Bethesda
Bethesda
Work continues along the alignment near East-West Highway
Bethesda Elevator Shaft - Dec. 2022
Bethesda
Rebar installation for the shaft enclosure building foundation
Bethesda Elevator Shaft - Dec. 2022
Bethesda
Rebar installation for the shaft enclosure building foundation
LRT bridge over Connecticut Ave. Nov. 22
Bethesda
Rebar is in place prior to the placement of concrete.
Bethesda Shaft Nov. 2022
Bethesda
Work on the elevator shaft that will connect to the Red Line continues
Talbot Avenue Bridge
Greater Lyttonsville / Woodside
Crews survey the Talbot Avenue bridge - Dec. 2022
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Concrete placement at the Rock Creek Park Light Rail Bridge Oct. 2022
Greater Lyttonsville / Woodside
Silver Spring MARC platform Access Jan. 2023
Silver Spring
Crews put the finishing touches on the new walkway to the MARC train platform from Ripley Street
Silver Spring Station- Jan. 2023
Silver Spring
Crews begin installing the forms for the Purple Line Silver Spring Station
Silver Spring Station -Jan. 2023
Silver Spring
Crews begin installing the forms for the Purple Line Silver Spring Station
Manchester Place Station Dec 2022
Long Branch
Support of excavation piles are removed to allow the construction of the western portal
Manchester Place Station Dec 2022
Long Branch
Survey teams take measurements in preparation of work to begin at the station.
University Blvd bridge over the Northwest Branch Dec. 2022
University Boulevard
Crews start demolition of the existing bridge
University Blvd bridge over the Northwest Branch Dec. 2022
University Boulevard
Traffic has been shifted to the recently completed bridge.
Univeristy Blvd stormwater drainage Dec. 2022
University Boulevard
Crews install large diameter stormwater piping along University near West Park Drive.
Campus Drive Track Dec. 2022
College Park
Concrete is placed to hold the embeded Light Rail Vehicle tracks.
Campus Drive Track Dec. 2022
College Park
Concrete is placed to hold the embedded Light Rail Vehicle tracks.
Riverdale Park North-UMD Station Feb. 2023
Riverdale Park
Concrete for the new station platforms being placed
Riverdale Park North-UMD Station Feb. 2023
Riverdale Park
Concrete for the new station platforms being placed
Riverdale Park North-UMD Station Feb. 2023
Riverdale Park
Concrete for the new station platforms being placed
Riverdale Park North-UMD Station Feb. 2023
Riverdale Park
Concrete for the new station platforms being placed
Riverdale Park North-UMD Dec. 22
Riverdale Park
Excavation is underway for Purple Line's Riverdale Park North-UMD Station
Riverdale Park North-UMD Dec. 22
Riverdale Park
Excavation is underway for Purple Line's Riverdale Park North-UMD Station
Glenridge Shopping Center Bridge Feb 2023
Glenridge / New Carrollton Metro
Seven girders in total were set in one day
Glenridge Shopping Center Bridge Feb 2023
Glenridge / New Carrollton Metro
Crews lift the 39,600 lb concrete girder
Glenridge Shopping Center Bridge Feb 2023
Glenridge / New Carrollton Metro
Crews lift the 39,600 lb concrete girder
Glenridge Shopping Center Bridge Feb 2023
Glenridge / New Carrollton Metro
Crews carefully place the 52-foot long concrete girder